JobFigure

Job costing for renovation contractors

Renovation margins disappear one small yes at a time: an extra outlet, a different tile, a pot filler. JobFigure makes each of those a variation before the work is done, and shows materials, subs, and crew hours against the job while you’re still on it.

What renovation builders track in JobFigure

Set up for renovation from the first day

When you pick Remodeling & Handyman as your trade, JobFigure loads these cost categories for budgets, receipts, and job costs. You can rename or add your own at any time.

Bid line items use the units renovation actually bid in: square metres (m²), metres (m), each (EA), hours (HR), and lump sum (LS).

Example: what a renovation job looks like mid-way

Gut and rebuild a kitchen: new cabinets, quartz tops, tile backsplash, LVT flooring, and lighting, with subs for electrical, plumbing, and countertops. The cabinets are in; the tops are being templated.

Kitchen renovation: contract €57,600
Cost categoryBudgetSpent so far
Materials€18,900€15,840
Labour€12,150€8,910
Subcontractor€10,800€5,760
Disposal€1,350€1,300
Permits€810€810
Supplies€1,440€990
Other€1,350€270
Total€46,800€33,880

The cabinets and flooring are bought, so materials at 84% is expected. Labour at 73% is the one to watch, with the backsplash, trim, and punch list ahead. Homeowner add-ons are where renovation margins disappear: if they asked for under-cabinet lights or a pot filler, log it as a variation before the electrician runs it.

Invoices the Irish way

Set your company to Ireland and every quote and invoice carries VAT, with Revenue’s reverse charge wording when you work for a principal contractor. Subcontractors can switch on RCT and show the deduction at the rate on the deduction authorisation. Prices are in euro. More in our guide: RCT and the VAT reverse charge for subcontractors in Ireland.