Job costing for remodeling contractors

Remodel margins disappear one small yes at a time: an extra outlet, a different tile, a pot filler. JobFigure makes each of those a change order before the work is done, and shows materials, subs, and crew hours against the job while you’re still on it.

What remodelers track in JobFigure

Set up for remodeling from the first day

When you pick Remodeling & Handyman as your trade, JobFigure loads these cost categories for budgets, receipts, and job costs. You can rename or add your own at any time.

Bid line items use the units remodeling actually bid in: square feet (SF), linear feet (LF), each (EA), hours (HR), and lump sum (LS).

Example: what a remodeling job looks like mid-way

Gut and rebuild a kitchen: new cabinets, quartz tops, tile backsplash, LVP flooring, and lighting, with subs for electrical, plumbing, and countertops. The cabinets are in; the tops are being templated.

Kitchen remodel: contract $64,000
Cost categoryBudgetSpent so far
Materials$21,000$17,600
Labor$13,500$9,900
Subcontractor$12,000$6,400
Disposal$1,500$1,450
Permits$900$900
Supplies$1,600$1,100
Other$1,500$300
Total$52,000$37,650

The cabinets and flooring are bought, so materials at 84% is expected. Labor at 73% is the one to watch, with the backsplash, trim, and punch list ahead. Homeowner add-ons are where remodel margins disappear: if they asked for under-cabinet lights or a pot filler, log it as a change order before the electrician runs it.