Job costing for electrical contractors
Electrical work is labour-heavy, and it happens in phases. The risk is that rough-in quietly uses up hours that were meant for trim, and nobody notices until the last week. JobFigure puts crew hours on the job as they happen, so you can check labour at the end of each phase.
What electrical contractors track in JobFigure
- Labour against each phase. Crews clock in to the job; compare labour spent to where you are in rough-in, trim, and finish.
- Materials vs. fixtures. Wire, conduit, and gear in one category, fixtures in another, so owner-supplied fixture changes stand out.
- Permits and inspections. Small costs, but they add up across jobs if they aren’t tracked.
- Changes in the field. Added circuits and relocated devices get logged as variations before the work is done.
Set up for electrical from the first day
When you pick Electrical as your trade, JobFigure loads these cost categories for budgets, receipts, and job costs. You can rename or add your own at any time.
- Materials
- Labour
- Fixtures
- Equipment Rental
- Permits
- Fuel
- Subcontractor
- Other
Bid line items use the units electrical actually bid in: metres (m), each (EA), and lump sum (LS).
Example: what a electrical job looks like mid-way
Rough-in is complete and trim-out starts next week. Fixtures haven’t been bought yet.
| Cost category | Budget | Spent so far |
|---|---|---|
| Materials | £12,800 | £11,840 |
| Labour | £24,000 | £17,280 |
| Fixtures | £8,800 | £0 |
| Equipment Rental | £1,200 | £720 |
| Permits | £640 | £640 |
| Other | £960 | £400 |
| Total | £48,400 | £30,880 |
Labour is 72% spent at the end of rough-in. If you planned rough-in at about 60% of your labour, trim starts 12 points behind. Now is the time to plan the crew for trim, or find the variation that explains the extra hours.
Invoices the UK way
Set your company to the United Kingdom and every quote and invoice carries VAT, with the domestic reverse charge when you work for a main contractor. Subcontractors can switch on CIS: enter the labour figure and the deduction comes off the labour only, alongside any retention. Prices are in pounds. More in our guide: CIS and the VAT reverse charge on subcontractor invoices.
Guides and tools for electrical contractors
CIS and the VAT reverse charge on subcontractor invoices
UK: what a subcontractor's invoice should show under CIS and the domestic reverse charge, with a worked example.
GuideGPS time clocks for construction crews: a practical guide
What GPS clocks fix, how they work, and what to watch for: notice, privacy, drive time, overtime.
GuideJob costing for contractors: a step-by-step guide
What counts as a job cost, and a six-step system to know what every job made before it’s over.