Renovation margins disappear one small yes at a time: an extra outlet, a different tile, a pot filler. JobFigure makes each of those a variation before the work is done, and shows materials, subs, and crew hours against the job while you’re still on it.

What renovation builders track in JobFigure

Set up for renovation from the first day

When you pick Remodeling & Handyman as your trade, JobFigure loads these cost categories for budgets, receipts, and job costs. You can rename or add your own at any time.

Bid line items use the units renovation actually bid in: square metres (m²), metres (m), each (EA), hours (HR), and lump sum (LS).

Example: what a renovation job looks like mid-way

Gut and rebuild a kitchen: new cabinets, quartz tops, tile backsplash, LVT flooring, and lighting, with subs for electrical, plumbing, and countertops. The cabinets are in; the tops are being templated.

Kitchen renovation: contract £51,200
Cost categoryBudgetSpent so far
Materials£16,800£14,080
Labour£10,800£7,920
Subcontractor£9,600£5,120
Disposal£1,200£1,160
Permits£720£720
Supplies£1,280£880
Other£1,200£240
Total£41,600£30,120

The cabinets and flooring are bought, so materials at 84% is expected. Labour at 73% is the one to watch, with the backsplash, trim, and punch list ahead. Homeowner add-ons are where renovation margins disappear: if they asked for under-cabinet lights or a pot filler, log it as a variation before the electrician runs it.

Invoices the UK way

Set your company to the United Kingdom and every quote and invoice carries VAT, with the domestic reverse charge when you work for a main contractor. Subcontractors can switch on CIS: enter the labour figure and the deduction comes off the labour only, alongside any retention. Prices are in pounds. More in our guide: CIS and the VAT reverse charge on subcontractor invoices.